The new tram bridge over the Scaricatore Canal

An article dedicated to the new tram bridge over the Scaricatore Canal, part of the SIR3 metrobus line in Padua, was recently published in the journal Costruzioni Metalliche.

The Executive Design, developed by Steel Project Engineering, involved a complex structural and erection study for a single-span truss of 89.6 meters, entirely built with S355 steel.

The article outlines the challenges faced and the design solutions adopted for both operation and cantilever launching, within a particularly complex geometric and construction context.

Article link: https://lnkd.in/d4p7sZsu