{"id":6126,"date":"2023-03-07T14:33:39","date_gmt":"2023-03-07T13:33:39","guid":{"rendered":"https:\/\/www.steelproject.it\/cta-2022-copertura-materie-prime\/"},"modified":"2025-06-03T14:33:23","modified_gmt":"2025-06-03T12:33:23","slug":"cta-2022-copertura-materie-prime","status":"publish","type":"post","link":"https:\/\/www.steelproject.it\/en\/cta-2022-copertura-materie-prime\/","title":{"rendered":"\u201cParchi Materie Prime\u201d"},"content":{"rendered":"<h1>Our works at CTA 2022<\/h1>\n<p>After the presentation at the CTA 2022, we illustrate our work regarding the \u201cAcciaierie di Taranto\u201d plant in which, on behalf of Fincantieri Infrastructure, we took care of the assembly project of the \u201cParchi Materie Prime\u201d roof.<\/p>\n<p>Due to the timing of implementation and the complexity of the assembly methodologies, this assignment represented a great challenge for our work team.<\/p>\n<p>The safe confinement steel structure for the OMO (raw materials) park located inside the \u201cAcciaierie d\u2019Italia\u201d factory in Taranto has plan dimensions of 110 x 385m and is made up of 63 trussed arches, spaced by 6.20 m and with a maximum height of approximately 42m. Because of the erection phases, the structure was divided into 9 macro-modules, each consisting of 7 arches. Once the central segments of each macro-module are assembled, they are raised by means of 4 strand jacks connected to a horizontal truss beam which can slide between vertical guides placed on the lifting towers. Once the assembly of a single macro-module was completed, it was placed on trolleys and then pushed towards its final position by means of a couple of strand jacks.<\/p>\n<p>This project, together with our other works that we will show you in the coming weeks, was selected to participate in the best design award at CTA 2022, which took place from 29 September to 1st October in Francavilla al Mare (Chieti).<\/p>\n<p>Some videos relating to the assembly can be viewed on ours YouTube channel, at this link: (<a href=\"https:\/\/www.youtube.com\/watch?v=0jR7KZ12ueA\" target=\"_blank\" rel=\"noopener\">video<\/a> &#8211; by kind permission of Fincantieri Infrastrutcure + Time Lapse by kind permission of SEMAT S.p.a.)<\/p>\n<p>Below is the poster with which we participated in the Best Design Award competition at the CTA, and some photos showing the various stages of assembly.<\/p>\n<p><img loading=\"lazy\" class=\"wp-image-6217 size-large\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/SCHEDA-A0_Taranto-726x1024.jpg\" alt=\"\" width=\"726\" height=\"1024\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/SCHEDA-A0_Taranto-726x1024.jpg 726w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/SCHEDA-A0_Taranto-213x300.jpg 213w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/SCHEDA-A0_Taranto-768x1083.jpg 768w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/SCHEDA-A0_Taranto-1089x1536.jpg 1089w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/SCHEDA-A0_Taranto.jpg 1170w\" sizes=\"(max-width: 726px) 100vw, 726px\" \/><\/p>\n<p><img loading=\"lazy\" class=\"wp-image-6248 size-full\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-10.jpeg\" alt=\"\" width=\"1024\" height=\"768\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-10.jpeg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-10-300x225.jpeg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-10-768x576.jpeg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p><img loading=\"lazy\" class=\"wp-image-6245 size-full\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-9.jpeg\" alt=\"\" width=\"1024\" height=\"768\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-9.jpeg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-9-300x225.jpeg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-9-768x576.jpeg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p><img loading=\"lazy\" class=\"wp-image-6242 size-full\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-8-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1920\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-8-scaled.jpg 2560w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-8-300x225.jpg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-8-1024x768.jpg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-8-768x576.jpg 768w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-8-1536x1152.jpg 1536w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-8-2048x1536.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/p>\n<p><img loading=\"lazy\" class=\"wp-image-6239 size-full\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-7--scaled.jpg\" alt=\"\" width=\"2560\" height=\"1920\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-7--scaled.jpg 2560w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-7--300x225.jpg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-7--1024x768.jpg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-7--768x576.jpg 768w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-7--1536x1152.jpg 1536w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-7--2048x1536.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/p>\n<p><img loading=\"lazy\" class=\"wp-image-6236 size-large\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-6-1024x577.jpg\" alt=\"\" width=\"1024\" height=\"577\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-6-1024x577.jpg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-6-300x169.jpg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-6-768x432.jpg 768w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-6-1536x865.jpg 1536w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-6.jpg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p><img loading=\"lazy\" class=\"wp-image-6229 size-large\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-4-1024x768.jpeg\" alt=\"\" width=\"1024\" height=\"768\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-4-1024x768.jpeg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-4-300x225.jpeg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-4-768x576.jpeg 768w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-4-1536x1152.jpeg 1536w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-4.jpeg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p><img loading=\"lazy\" class=\"wp-image-6226 size-large\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-3-685x1024.jpg\" alt=\"\" width=\"685\" height=\"1024\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-3-685x1024.jpg 685w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-3-201x300.jpg 201w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-3-768x1147.jpg 768w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-3-1028x1536.jpg 1028w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-3-1371x2048.jpg 1371w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-3-scaled.jpg 1714w\" sizes=\"(max-width: 685px) 100vw, 685px\" \/><\/p>\n<p><img loading=\"lazy\" class=\"wp-image-6223 size-large\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-2-768x1024.jpg\" alt=\"\" width=\"768\" height=\"1024\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-2-768x1024.jpg 768w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-2-225x300.jpg 225w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-2-1152x1536.jpg 1152w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-2-1536x2048.jpg 1536w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-2-scaled.jpg 1920w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/p>\n<p><img loading=\"lazy\" class=\"wp-image-6220 size-large\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-1--1024x768.jpg\" alt=\"\" width=\"1024\" height=\"768\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-1--1024x768.jpg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-1--300x225.jpg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-1--768x576.jpg 768w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-1--1536x1152.jpg 1536w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/taranto-1--2048x1536.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Our works at CTA 2022 After the presentation at the CTA 2022, we illustrate our work regarding the \u201cAcciaierie di Taranto\u201d plant in [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":6214,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[183],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.3 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>\u201cParchi Materie Prime\u201d - Steel Project Engineering<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.steelproject.it\/en\/cta-2022-copertura-materie-prime\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u201cParchi Materie Prime\u201d - Steel Project Engineering\" \/>\n<meta property=\"og:description\" content=\"Our works at CTA 2022 After the presentation at the CTA 2022, we illustrate our work regarding the \u201cAcciaierie di Taranto\u201d plant in [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.steelproject.it\/en\/cta-2022-copertura-materie-prime\/\" \/>\n<meta property=\"og:site_name\" content=\"Steel Project Engineering\" \/>\n<meta property=\"article:published_time\" content=\"2023-03-07T13:33:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-06-03T12:33:23+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/Anteprima-Taranto.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"AdminAim AdminAim\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.steelproject.it\/#website\",\"url\":\"https:\/\/www.steelproject.it\/\",\"name\":\"Steel Project Engineering\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.steelproject.it\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.steelproject.it\/en\/cta-2022-copertura-materie-prime\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/Anteprima-Taranto.jpeg\",\"contentUrl\":\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/Anteprima-Taranto.jpeg\",\"width\":1024,\"height\":768},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.steelproject.it\/en\/cta-2022-copertura-materie-prime\/#webpage\",\"url\":\"https:\/\/www.steelproject.it\/en\/cta-2022-copertura-materie-prime\/\",\"name\":\"\u201cParchi Materie Prime\u201d - Steel Project Engineering\",\"isPartOf\":{\"@id\":\"https:\/\/www.steelproject.it\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.steelproject.it\/en\/cta-2022-copertura-materie-prime\/#primaryimage\"},\"datePublished\":\"2023-03-07T13:33:39+00:00\",\"dateModified\":\"2025-06-03T12:33:23+00:00\",\"author\":{\"@id\":\"https:\/\/www.steelproject.it\/#\/schema\/person\/2ffb328c53e7a3d7eb59cd0f05a532a2\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.steelproject.it\/en\/cta-2022-copertura-materie-prime\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.steelproject.it\/en\/cta-2022-copertura-materie-prime\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.steelproject.it\/en\/cta-2022-copertura-materie-prime\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.steelproject.it\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u201cParchi Materie Prime\u201d\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.steelproject.it\/#\/schema\/person\/2ffb328c53e7a3d7eb59cd0f05a532a2\",\"name\":\"AdminAim AdminAim\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.steelproject.it\/#personlogo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/9c2d1996d56f35f1b3ed5fa0620eb5df?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/9c2d1996d56f35f1b3ed5fa0620eb5df?s=96&d=mm&r=g\",\"caption\":\"AdminAim AdminAim\"},\"url\":\"https:\/\/www.steelproject.it\/en\/author\/adminaim\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"\u201cParchi Materie Prime\u201d - Steel Project Engineering","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.steelproject.it\/en\/cta-2022-copertura-materie-prime\/","og_locale":"en_US","og_type":"article","og_title":"\u201cParchi Materie Prime\u201d - Steel Project Engineering","og_description":"Our works at CTA 2022 After the presentation at the CTA 2022, we illustrate our work regarding the \u201cAcciaierie di Taranto\u201d plant in [&hellip;]","og_url":"https:\/\/www.steelproject.it\/en\/cta-2022-copertura-materie-prime\/","og_site_name":"Steel Project Engineering","article_published_time":"2023-03-07T13:33:39+00:00","article_modified_time":"2025-06-03T12:33:23+00:00","og_image":[{"width":1024,"height":768,"url":"http:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/Anteprima-Taranto.jpeg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Written by":"AdminAim AdminAim","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/www.steelproject.it\/#website","url":"https:\/\/www.steelproject.it\/","name":"Steel Project Engineering","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.steelproject.it\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"ImageObject","@id":"https:\/\/www.steelproject.it\/en\/cta-2022-copertura-materie-prime\/#primaryimage","inLanguage":"en-US","url":"https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/Anteprima-Taranto.jpeg","contentUrl":"https:\/\/www.steelproject.it\/wp-content\/uploads\/2023\/03\/Anteprima-Taranto.jpeg","width":1024,"height":768},{"@type":"WebPage","@id":"https:\/\/www.steelproject.it\/en\/cta-2022-copertura-materie-prime\/#webpage","url":"https:\/\/www.steelproject.it\/en\/cta-2022-copertura-materie-prime\/","name":"\u201cParchi Materie Prime\u201d - Steel Project Engineering","isPartOf":{"@id":"https:\/\/www.steelproject.it\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.steelproject.it\/en\/cta-2022-copertura-materie-prime\/#primaryimage"},"datePublished":"2023-03-07T13:33:39+00:00","dateModified":"2025-06-03T12:33:23+00:00","author":{"@id":"https:\/\/www.steelproject.it\/#\/schema\/person\/2ffb328c53e7a3d7eb59cd0f05a532a2"},"breadcrumb":{"@id":"https:\/\/www.steelproject.it\/en\/cta-2022-copertura-materie-prime\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.steelproject.it\/en\/cta-2022-copertura-materie-prime\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.steelproject.it\/en\/cta-2022-copertura-materie-prime\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.steelproject.it\/en\/"},{"@type":"ListItem","position":2,"name":"\u201cParchi Materie Prime\u201d"}]},{"@type":"Person","@id":"https:\/\/www.steelproject.it\/#\/schema\/person\/2ffb328c53e7a3d7eb59cd0f05a532a2","name":"AdminAim AdminAim","image":{"@type":"ImageObject","@id":"https:\/\/www.steelproject.it\/#personlogo","inLanguage":"en-US","url":"https:\/\/secure.gravatar.com\/avatar\/9c2d1996d56f35f1b3ed5fa0620eb5df?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9c2d1996d56f35f1b3ed5fa0620eb5df?s=96&d=mm&r=g","caption":"AdminAim AdminAim"},"url":"https:\/\/www.steelproject.it\/en\/author\/adminaim\/"}]}},"_links":{"self":[{"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/posts\/6126"}],"collection":[{"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/comments?post=6126"}],"version-history":[{"count":4,"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/posts\/6126\/revisions"}],"predecessor-version":[{"id":6462,"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/posts\/6126\/revisions\/6462"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/media\/6214"}],"wp:attachment":[{"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/media?parent=6126"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/categories?post=6126"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/tags?post=6126"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}