{"id":8758,"date":"2025-06-19T13:55:39","date_gmt":"2025-06-19T11:55:39","guid":{"rendered":"https:\/\/www.steelproject.it\/?p=8758"},"modified":"2025-06-23T12:19:52","modified_gmt":"2025-06-23T10:19:52","slug":"the-gare-du-parc-des-expositions-construction-site","status":"publish","type":"post","link":"https:\/\/www.steelproject.it\/en\/the-gare-du-parc-des-expositions-construction-site\/","title":{"rendered":"The Gare du Parc des Expositions construction site"},"content":{"rendered":"<p data-start=\"162\" data-end=\"271\"><strong data-start=\"162\" data-end=\"271\">Steel Project Engineering visits the Gare du Parc des Expositions construction site \u2013 Grand Paris Express<\/strong><\/p>\n<p data-start=\"273\" data-end=\"549\">In recent days, Eng. Giovanni Costa, Eng. Leonardo Balocchi, Eng. Simone Pardini, and Eng. Simona Paone travelled to Paris for an on-site visit to the Gare du Parc des Expositions construction site, one of the key infrastructures of the new Line 17 of the Grand Paris Express.<\/p>\n<p data-start=\"551\" data-end=\"998\">Steel Project Engineering Srl is involved in the project as the company responsible, on behalf of Cimolai SpA, for the Detailed Design of the \u201cGare du Parc des Expositions\u201d station and the pedestrian bridge connecting the surrounding areas to the existing railway and to the Parc des Expositions. The company is also in charge of the erection design of the station building, the pedestrian bridge structures, and the steel decks of the line works.<\/p>\n<p data-start=\"1000\" data-end=\"1371\">The station, intersected by the metro line viaduct (independent from the main building), is developed across 4 levels, with a total length of approximately 181 meters (without expansion joints) and a width of around 28 meters. A complex structure that combines steel elements, reinforced concrete works, and high-end engineering finishes such as the EFTE cushion roofing.<\/p>\n<p data-start=\"1373\" data-end=\"1719\">The pedestrian bridge, covering approximately 1,600 m\u00b2, features a slender and articulated geometry, with ramps, elevators, and covered walkways. To ensure structural safety and dynamic comfort, specific dynamic analyses have been conducted to calibrate the TMD (Tuned Mass Dampers) and damping systems required for user comfort during operation.<\/p>\n<p data-start=\"1721\" data-end=\"1795\">We thank Cimolai for their trust and for the warm hospitality and welcome.<\/p>\n<p><img loading=\"lazy\" class=\"size-medium wp-image-8681 aligncenter\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_01-225x300.jpg\" alt=\"\" width=\"225\" height=\"300\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_01-225x300.jpg 225w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_01-768x1024.jpg 768w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_01-1152x1536.jpg 1152w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_01-1536x2048.jpg 1536w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_01-scaled.jpg 1920w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/> <img loading=\"lazy\" class=\"size-medium wp-image-8684 aligncenter\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_02-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_02-300x225.jpg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_02-1024x768.jpg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_02-768x576.jpg 768w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" class=\"size-medium wp-image-8687 aligncenter\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_03-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_03-300x225.jpg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_03-1024x768.jpg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_03-768x576.jpg 768w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" class=\"size-medium wp-image-8690 aligncenter\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_04-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_04-300x225.jpg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_04-1024x768.jpg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_04-768x576.jpg 768w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" class=\"size-medium wp-image-8693 aligncenter\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_05-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_05-300x225.jpg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_05-1024x768.jpg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_05-768x576.jpg 768w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_05-1536x1152.jpg 1536w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_05-2048x1536.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" class=\"size-medium wp-image-8696 aligncenter\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_05a-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_05a-300x225.jpg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_05a-1024x768.jpg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_05a-768x576.jpg 768w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_05a-1536x1152.jpg 1536w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_05a-2048x1536.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" class=\"size-medium wp-image-8699 aligncenter\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_06-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_06-300x225.jpg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_06-1024x768.jpg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_06-768x576.jpg 768w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_06-1536x1152.jpg 1536w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_06-2048x1536.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" class=\"size-medium wp-image-8702 aligncenter\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_07-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_07-300x225.jpg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_07-1024x768.jpg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_07-768x576.jpg 768w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" class=\"size-medium wp-image-8705 aligncenter\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_08.jpg\" alt=\"\" width=\"300\" height=\"225\" \/> <img loading=\"lazy\" class=\"size-medium wp-image-8708 aligncenter\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_09.jpg\" alt=\"\" width=\"300\" height=\"225\" \/> <img loading=\"lazy\" class=\"size-medium wp-image-8711 aligncenter\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_010a-300x215.jpg\" alt=\"\" width=\"300\" height=\"215\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_010a-300x215.jpg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_010a-1024x734.jpg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_010a-768x550.jpg 768w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_010a-1536x1101.jpg 1536w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_010a-2048x1467.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" class=\"size-medium wp-image-8714 aligncenter\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_011-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_011-300x225.jpg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_011-1024x768.jpg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_011-768x576.jpg 768w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_011-1536x1152.jpg 1536w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_011-2048x1536.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" class=\"size-medium wp-image-8717 aligncenter\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_012-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_012-300x225.jpg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_012-1024x768.jpg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_012-768x576.jpg 768w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_012-1536x1152.jpg 1536w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_012-2048x1536.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" class=\"size-medium wp-image-8720 aligncenter\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_013-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_013-300x225.jpg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_013-1024x768.jpg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_013-768x576.jpg 768w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" class=\"size-medium wp-image-8723 aligncenter\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_014-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_014-300x225.jpg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_014-1024x768.jpg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_014-768x576.jpg 768w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" class=\"size-medium wp-image-8726 aligncenter\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_015-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_015-300x225.jpg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_015-1024x768.jpg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_015-768x576.jpg 768w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" class=\"size-medium wp-image-8729 aligncenter\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_016-300x134.jpg\" alt=\"\" width=\"300\" height=\"134\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_016-300x134.jpg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_016-1024x456.jpg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_016-768x342.jpg 768w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_016-1536x684.jpg 1536w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_016-2048x912.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" class=\"size-medium wp-image-8732 aligncenter\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_017-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_017-300x225.jpg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_017-1024x768.jpg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_017-768x576.jpg 768w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_017-1536x1152.jpg 1536w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_017-2048x1536.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" class=\"size-medium wp-image-8735 aligncenter\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_018-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" \/> <img loading=\"lazy\" class=\"size-medium wp-image-8738 aligncenter\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_019.jpg\" alt=\"\" width=\"300\" height=\"225\" \/> <img loading=\"lazy\" class=\"size-medium wp-image-8741 aligncenter\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_020-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_020-300x225.jpg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_020-1024x768.jpg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_020-768x576.jpg 768w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_020-1536x1152.jpg 1536w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_020-2048x1536.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" class=\"size-medium wp-image-8744 aligncenter\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_021-225x300.jpg\" alt=\"\" width=\"225\" height=\"300\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_021-225x300.jpg 225w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_021-768x1024.jpg 768w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_021-1152x1536.jpg 1152w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_021-1536x2048.jpg 1536w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Foto_021-scaled.jpg 1920w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Steel Project Engineering visits the Gare du Parc des Expositions construction site \u2013 Grand Paris Express In recent days, Eng. Giovanni Costa, Eng. [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":8753,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[183],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.3 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>The Gare du Parc des Expositions construction site - Steel Project Engineering<\/title>\n<meta name=\"description\" content=\"Steel Project Engineering visits the Gare du Parc des Expositions construction site \u2013 Grand Paris Express (Paris)\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.steelproject.it\/en\/the-gare-du-parc-des-expositions-construction-site\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Gare du Parc des Expositions construction site - Steel Project Engineering\" \/>\n<meta property=\"og:description\" content=\"Steel Project Engineering visits the Gare du Parc des Expositions construction site \u2013 Grand Paris Express (Paris)\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.steelproject.it\/en\/the-gare-du-parc-des-expositions-construction-site\/\" \/>\n<meta property=\"og:site_name\" content=\"Steel Project Engineering\" \/>\n<meta property=\"article:published_time\" content=\"2025-06-19T11:55:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-06-23T10:19:52+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Copertina-e1750671625567.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Elisa Severi\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.steelproject.it\/#website\",\"url\":\"https:\/\/www.steelproject.it\/\",\"name\":\"Steel Project Engineering\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.steelproject.it\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.steelproject.it\/en\/the-gare-du-parc-des-expositions-construction-site\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Copertina-e1750671625567.jpeg\",\"contentUrl\":\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Copertina-e1750671625567.jpeg\",\"width\":1024,\"height\":768},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.steelproject.it\/en\/the-gare-du-parc-des-expositions-construction-site\/#webpage\",\"url\":\"https:\/\/www.steelproject.it\/en\/the-gare-du-parc-des-expositions-construction-site\/\",\"name\":\"The Gare du Parc des Expositions construction site - Steel Project Engineering\",\"isPartOf\":{\"@id\":\"https:\/\/www.steelproject.it\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.steelproject.it\/en\/the-gare-du-parc-des-expositions-construction-site\/#primaryimage\"},\"datePublished\":\"2025-06-19T11:55:39+00:00\",\"dateModified\":\"2025-06-23T10:19:52+00:00\",\"author\":{\"@id\":\"https:\/\/www.steelproject.it\/#\/schema\/person\/3df3d6cee7148052c4a7f3736960fb82\"},\"description\":\"Steel Project Engineering visits the Gare du Parc des Expositions construction site \u2013 Grand Paris Express (Paris)\",\"breadcrumb\":{\"@id\":\"https:\/\/www.steelproject.it\/en\/the-gare-du-parc-des-expositions-construction-site\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.steelproject.it\/en\/the-gare-du-parc-des-expositions-construction-site\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.steelproject.it\/en\/the-gare-du-parc-des-expositions-construction-site\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.steelproject.it\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Gare du Parc des Expositions construction site\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.steelproject.it\/#\/schema\/person\/3df3d6cee7148052c4a7f3736960fb82\",\"name\":\"Elisa Severi\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.steelproject.it\/#personlogo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/f506bc4d8ad3f936d942132870df0d40?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/f506bc4d8ad3f936d942132870df0d40?s=96&d=mm&r=g\",\"caption\":\"Elisa Severi\"},\"url\":\"https:\/\/www.steelproject.it\/en\/author\/eseveri\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Gare du Parc des Expositions construction site - Steel Project Engineering","description":"Steel Project Engineering visits the Gare du Parc des Expositions construction site \u2013 Grand Paris Express (Paris)","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.steelproject.it\/en\/the-gare-du-parc-des-expositions-construction-site\/","og_locale":"en_US","og_type":"article","og_title":"The Gare du Parc des Expositions construction site - Steel Project Engineering","og_description":"Steel Project Engineering visits the Gare du Parc des Expositions construction site \u2013 Grand Paris Express (Paris)","og_url":"https:\/\/www.steelproject.it\/en\/the-gare-du-parc-des-expositions-construction-site\/","og_site_name":"Steel Project Engineering","article_published_time":"2025-06-19T11:55:39+00:00","article_modified_time":"2025-06-23T10:19:52+00:00","og_image":[{"width":1024,"height":768,"url":"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Copertina-e1750671625567.jpeg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Written by":"Elisa Severi","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/www.steelproject.it\/#website","url":"https:\/\/www.steelproject.it\/","name":"Steel Project Engineering","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.steelproject.it\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"ImageObject","@id":"https:\/\/www.steelproject.it\/en\/the-gare-du-parc-des-expositions-construction-site\/#primaryimage","inLanguage":"en-US","url":"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Copertina-e1750671625567.jpeg","contentUrl":"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/06\/Copertina-e1750671625567.jpeg","width":1024,"height":768},{"@type":"WebPage","@id":"https:\/\/www.steelproject.it\/en\/the-gare-du-parc-des-expositions-construction-site\/#webpage","url":"https:\/\/www.steelproject.it\/en\/the-gare-du-parc-des-expositions-construction-site\/","name":"The Gare du Parc des Expositions construction site - Steel Project Engineering","isPartOf":{"@id":"https:\/\/www.steelproject.it\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.steelproject.it\/en\/the-gare-du-parc-des-expositions-construction-site\/#primaryimage"},"datePublished":"2025-06-19T11:55:39+00:00","dateModified":"2025-06-23T10:19:52+00:00","author":{"@id":"https:\/\/www.steelproject.it\/#\/schema\/person\/3df3d6cee7148052c4a7f3736960fb82"},"description":"Steel Project Engineering visits the Gare du Parc des Expositions construction site \u2013 Grand Paris Express (Paris)","breadcrumb":{"@id":"https:\/\/www.steelproject.it\/en\/the-gare-du-parc-des-expositions-construction-site\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.steelproject.it\/en\/the-gare-du-parc-des-expositions-construction-site\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.steelproject.it\/en\/the-gare-du-parc-des-expositions-construction-site\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.steelproject.it\/en\/"},{"@type":"ListItem","position":2,"name":"The Gare du Parc des Expositions construction site"}]},{"@type":"Person","@id":"https:\/\/www.steelproject.it\/#\/schema\/person\/3df3d6cee7148052c4a7f3736960fb82","name":"Elisa Severi","image":{"@type":"ImageObject","@id":"https:\/\/www.steelproject.it\/#personlogo","inLanguage":"en-US","url":"https:\/\/secure.gravatar.com\/avatar\/f506bc4d8ad3f936d942132870df0d40?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f506bc4d8ad3f936d942132870df0d40?s=96&d=mm&r=g","caption":"Elisa Severi"},"url":"https:\/\/www.steelproject.it\/en\/author\/eseveri\/"}]}},"_links":{"self":[{"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/posts\/8758"}],"collection":[{"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/comments?post=8758"}],"version-history":[{"count":1,"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/posts\/8758\/revisions"}],"predecessor-version":[{"id":8759,"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/posts\/8758\/revisions\/8759"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/media\/8753"}],"wp:attachment":[{"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/media?parent=8758"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/categories?post=8758"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/tags?post=8758"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}