{"id":8760,"date":"2025-04-14T19:57:16","date_gmt":"2025-04-14T17:57:16","guid":{"rendered":"https:\/\/www.steelproject.it\/?p=8760"},"modified":"2025-06-23T12:38:57","modified_gmt":"2025-06-23T10:38:57","slug":"the-new-dea-san-giovanni-di-dio-hospital","status":"publish","type":"post","link":"https:\/\/www.steelproject.it\/en\/the-new-dea-san-giovanni-di-dio-hospital\/","title":{"rendered":"The new DEA San Giovanni di Dio Hospital"},"content":{"rendered":"<p data-start=\"213\" data-end=\"585\">We are sharing the post from Hydea announcing the approval of the Executive Project for the first phase of the new Emergency and Admission Department (DEA) at the San Giovanni di Dio Hospital ( Torregalli) , Florence.<br data-start=\"429\" data-end=\"432\" \/>This is a strategic intervention that will strengthen emergency response capacity and improve the efficiency of healthcare services in the Florence area.<\/p>\n<p data-start=\"587\" data-end=\"1208\">This important milestone was made possible thanks to the joint effort of a multidisciplinary team of professionals, united by the goal of providing citizens with a modern, efficient, and cutting-edge healthcare infrastructure.<br data-start=\"813\" data-end=\"816\" \/>Steel Project Engineering, acting as principal of the design partnership (RTP) with Hydea (lead firm), L+Partner, Beta Progetti, and Eng. Francesco Gianola (partners), was responsible for the structural and geotechnical design of the main building, the connective body linking to the existing Vespucci Pavilion, and the stabilization works of the hillside upstream from the intervention area.<\/p>\n<p data-start=\"1210\" data-end=\"1449\">The new DEA will be housed in a building covering 11,000 square meters and will serve as a benchmark for emergency care, with 4,000 square meters dedicated to the emergency room and the capacity to accommodate up to 50,000 visits per year.<\/p>\n<p data-start=\"1451\" data-end=\"1474\">\ud83d\udccc <strong data-start=\"1454\" data-end=\"1474\">The New Pavilion<\/strong><\/p>\n<p data-start=\"1476\" data-end=\"1639\">The project includes four levels, one of which is underground, and provides functional integration with the existing facilities through two main distribution axes:<\/p>\n<p data-start=\"1641\" data-end=\"1779\">\ud83d\udd39 West \u2013 access for external users aligned with the entrance gallery<br data-start=\"1710\" data-end=\"1713\" \/>\ud83d\udd39 East \u2013 connection with the Vespucci Pavilion for internal flows<\/p>\n<p data-start=\"1781\" data-end=\"1856\">For more information, see the original <a href=\"https:\/\/www.linkedin.com\/posts\/hydea-spa_abbiamo-completato-e-consegnato-il-progetto-ugcPost-7303465911846379520-Uu-9?utm_source=share&amp;utm_medium=member_android&amp;rcm=ACoAAAXyWggBmIdRfQ2tWNGqJvW-qWu7EU_6zVY\">post published by Hydea on LinkedIn.<\/a><\/p>\n<p data-start=\"1858\" data-end=\"1950\">#Healthcare #SteelProjectEngineering #StructuralDesign #BIM #DEA #Torregalli #Sustainability<\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" class=\"wp-image-8608 size-full\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/DEA2.jpeg\" alt=\"\" width=\"800\" height=\"450\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/DEA2.jpeg 800w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/DEA2-300x169.jpeg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/DEA2-768x432.jpeg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/p>\n<p><img loading=\"lazy\" class=\"wp-image-8617 size-full\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/Modello-BIM_2.jpg\" alt=\"\" width=\"980\" height=\"369\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/Modello-BIM_2.jpg 980w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/Modello-BIM_2-300x113.jpg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/Modello-BIM_2-768x289.jpg 768w\" sizes=\"(max-width: 980px) 100vw, 980px\" \/><\/p>\n<p><img loading=\"lazy\" class=\"wp-image-8620 size-large\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/Modello-BIM_3-1024x709.jpg\" alt=\"\" width=\"1024\" height=\"709\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/Modello-BIM_3-1024x709.jpg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/Modello-BIM_3-300x208.jpg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/Modello-BIM_3-768x532.jpg 768w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/Modello-BIM_3.jpg 1279w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p><img loading=\"lazy\" class=\"wp-image-8614 size-full\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/Modello-BIM_1.jpg\" alt=\"\" width=\"1080\" height=\"754\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/Modello-BIM_1.jpg 1080w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/Modello-BIM_1-300x209.jpg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/Modello-BIM_1-1024x715.jpg 1024w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/Modello-BIM_1-768x536.jpg 768w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/p>\n<p><img loading=\"lazy\" class=\"wp-image-8611 size-full\" src=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/DEA3.jpeg\" alt=\"\" width=\"800\" height=\"450\" srcset=\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/DEA3.jpeg 800w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/DEA3-300x169.jpeg 300w, https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/DEA3-768x432.jpeg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>We are sharing the post from Hydea announcing the approval of the Executive Project for the first phase of the new Emergency and [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":8606,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[183],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.3 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>The new DEA San Giovanni di Dio Hospital - Steel Project Engineering<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.steelproject.it\/en\/the-new-dea-san-giovanni-di-dio-hospital\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The new DEA San Giovanni di Dio Hospital - Steel Project Engineering\" \/>\n<meta property=\"og:description\" content=\"We are sharing the post from Hydea announcing the approval of the Executive Project for the first phase of the new Emergency and [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.steelproject.it\/en\/the-new-dea-san-giovanni-di-dio-hospital\/\" \/>\n<meta property=\"og:site_name\" content=\"Steel Project Engineering\" \/>\n<meta property=\"article:published_time\" content=\"2025-04-14T17:57:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-06-23T10:38:57+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/DEA1-e1744653471176.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"450\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Elisa Severi\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.steelproject.it\/#website\",\"url\":\"https:\/\/www.steelproject.it\/\",\"name\":\"Steel Project Engineering\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.steelproject.it\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.steelproject.it\/en\/the-new-dea-san-giovanni-di-dio-hospital\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/DEA1-e1744653471176.jpeg\",\"contentUrl\":\"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/DEA1-e1744653471176.jpeg\",\"width\":800,\"height\":450},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.steelproject.it\/en\/the-new-dea-san-giovanni-di-dio-hospital\/#webpage\",\"url\":\"https:\/\/www.steelproject.it\/en\/the-new-dea-san-giovanni-di-dio-hospital\/\",\"name\":\"The new DEA San Giovanni di Dio Hospital - Steel Project Engineering\",\"isPartOf\":{\"@id\":\"https:\/\/www.steelproject.it\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.steelproject.it\/en\/the-new-dea-san-giovanni-di-dio-hospital\/#primaryimage\"},\"datePublished\":\"2025-04-14T17:57:16+00:00\",\"dateModified\":\"2025-06-23T10:38:57+00:00\",\"author\":{\"@id\":\"https:\/\/www.steelproject.it\/#\/schema\/person\/3df3d6cee7148052c4a7f3736960fb82\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.steelproject.it\/en\/the-new-dea-san-giovanni-di-dio-hospital\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.steelproject.it\/en\/the-new-dea-san-giovanni-di-dio-hospital\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.steelproject.it\/en\/the-new-dea-san-giovanni-di-dio-hospital\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.steelproject.it\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The new DEA San Giovanni di Dio Hospital\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.steelproject.it\/#\/schema\/person\/3df3d6cee7148052c4a7f3736960fb82\",\"name\":\"Elisa Severi\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.steelproject.it\/#personlogo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/f506bc4d8ad3f936d942132870df0d40?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/f506bc4d8ad3f936d942132870df0d40?s=96&d=mm&r=g\",\"caption\":\"Elisa Severi\"},\"url\":\"https:\/\/www.steelproject.it\/en\/author\/eseveri\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The new DEA San Giovanni di Dio Hospital - Steel Project Engineering","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.steelproject.it\/en\/the-new-dea-san-giovanni-di-dio-hospital\/","og_locale":"en_US","og_type":"article","og_title":"The new DEA San Giovanni di Dio Hospital - Steel Project Engineering","og_description":"We are sharing the post from Hydea announcing the approval of the Executive Project for the first phase of the new Emergency and [&hellip;]","og_url":"https:\/\/www.steelproject.it\/en\/the-new-dea-san-giovanni-di-dio-hospital\/","og_site_name":"Steel Project Engineering","article_published_time":"2025-04-14T17:57:16+00:00","article_modified_time":"2025-06-23T10:38:57+00:00","og_image":[{"width":800,"height":450,"url":"http:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/DEA1-e1744653471176.jpeg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Written by":"Elisa Severi","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/www.steelproject.it\/#website","url":"https:\/\/www.steelproject.it\/","name":"Steel Project Engineering","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.steelproject.it\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"ImageObject","@id":"https:\/\/www.steelproject.it\/en\/the-new-dea-san-giovanni-di-dio-hospital\/#primaryimage","inLanguage":"en-US","url":"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/DEA1-e1744653471176.jpeg","contentUrl":"https:\/\/www.steelproject.it\/wp-content\/uploads\/2025\/04\/DEA1-e1744653471176.jpeg","width":800,"height":450},{"@type":"WebPage","@id":"https:\/\/www.steelproject.it\/en\/the-new-dea-san-giovanni-di-dio-hospital\/#webpage","url":"https:\/\/www.steelproject.it\/en\/the-new-dea-san-giovanni-di-dio-hospital\/","name":"The new DEA San Giovanni di Dio Hospital - Steel Project Engineering","isPartOf":{"@id":"https:\/\/www.steelproject.it\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.steelproject.it\/en\/the-new-dea-san-giovanni-di-dio-hospital\/#primaryimage"},"datePublished":"2025-04-14T17:57:16+00:00","dateModified":"2025-06-23T10:38:57+00:00","author":{"@id":"https:\/\/www.steelproject.it\/#\/schema\/person\/3df3d6cee7148052c4a7f3736960fb82"},"breadcrumb":{"@id":"https:\/\/www.steelproject.it\/en\/the-new-dea-san-giovanni-di-dio-hospital\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.steelproject.it\/en\/the-new-dea-san-giovanni-di-dio-hospital\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.steelproject.it\/en\/the-new-dea-san-giovanni-di-dio-hospital\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.steelproject.it\/en\/"},{"@type":"ListItem","position":2,"name":"The new DEA San Giovanni di Dio Hospital"}]},{"@type":"Person","@id":"https:\/\/www.steelproject.it\/#\/schema\/person\/3df3d6cee7148052c4a7f3736960fb82","name":"Elisa Severi","image":{"@type":"ImageObject","@id":"https:\/\/www.steelproject.it\/#personlogo","inLanguage":"en-US","url":"https:\/\/secure.gravatar.com\/avatar\/f506bc4d8ad3f936d942132870df0d40?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f506bc4d8ad3f936d942132870df0d40?s=96&d=mm&r=g","caption":"Elisa Severi"},"url":"https:\/\/www.steelproject.it\/en\/author\/eseveri\/"}]}},"_links":{"self":[{"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/posts\/8760"}],"collection":[{"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/comments?post=8760"}],"version-history":[{"count":1,"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/posts\/8760\/revisions"}],"predecessor-version":[{"id":8761,"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/posts\/8760\/revisions\/8761"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/media\/8606"}],"wp:attachment":[{"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/media?parent=8760"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/categories?post=8760"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.steelproject.it\/en\/wp-json\/wp\/v2\/tags?post=8760"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}