TENDERS ... Filtro Progetti

Egna, Italy

Arch bridge over the river Adige and viaducts over the highway A22

Final detailed design, erection and launching design.

Category: Tenders
Services: Detailed design – tender won
Period: October 2019
Client: Bit s.p.a.
Amount: € 3’142’407 (S.04)

The bowstring bridge over the river Adige consists of a single 81.4m span and supports a 6.5 m wide carriageway , a pedestrian walkway and cycle path. The box-section deck consists of an orthotropic plate on top and one eccentric arch inclined 20° from the vertical. The arch has an irregular pentagonal section.

The bowstring bridge over the river Adige consists of a single 81.4m span and supports a 6.5 m wide carriageway , a pedestrian walkway and cycle path. The box-section deck consists of an orthotropic plate on top and one eccentric arch inclined 20° from the vertical. The arch has an irregular pentagonal section.

The arch-deck connection is made by means of hangers in welded H-section profiles with variable height. The deck consists of a multicellular box multicellular with 5 webs with a height maximum of 1.6 m and diaphragms spaced by 3.3m. The cycle path and the footbridge, with an effective width of 2.8 m and 2.5 m, are supported by I-section cantilever with variable height.

The arch-deck connection is made by means of hangers in welded H-section profiles with variable height. The deck consists of a multicellular box multicellular with 5 webs with a height maximum of 1.6 m and diaphragms spaced by 3.3m. The cycle path and the footbridge, with an effective width of 2.8 m and 2.5 m, are supported by I-section cantilever with variable height.

The viaduct over the highway A22 has a single 46m span with a bowstring scheme. Except the dimensions , the work present the memes features than the bridge over the Adige.

The viaduct over the highway A22 has a single 46m span with a bowstring scheme. Except the dimensions , the work present the memes features than the bridge over the Adige.