SPECIAL EQUIPMENT ... Filtro Progetti

Montreal, Canada

Montreal Metro

Metallic equipment for the prefabrication of SCC viaduct segments.

Category: Special Equipment
Services: Detailed Design
Period: May 2018 – December 2018
Client: Deal s.r.l.

Design of the metal structures constituting the movement and formwork support elements for the prefabrication of the elementary segments of a reinforced concrete deck made with the “short line” system.

Design of the metal structures constituting the movement and formwork support elements for the prefabrication of the elementary segments of a reinforced concrete deck made with the “short line” system.

Design of metal structures constituting the fixed and mobile head,fixed head support towers, segment moving wagons. Design of sheet metal formwork structures and rigging and stripping equipment.

Design of metal structures constituting the fixed and mobile head,fixed head support towers, segment moving wagons. Design of sheet metal formwork structures and rigging and stripping equipment.

The equipment designed was used to manufacture different types of segments:
• Viaduct M194 – Typical segment and piles – Width 9.3 m, height 2.60 m, length variable from 3.05 to 3.70 m.
• Viaduct M195 – Section and typical pile – Width 9.3m, height 2.95m, length variable from 2.8 to 3.75m.

The equipment designed was used to manufacture different types of segments:
• Viaduct M194 – Typical segment and piles – Width 9.3 m, height 2.60 m, length variable from 3.05 to 3.70 m.
• Viaduct M195 – Section and typical pile – Width 9.3m, height 2.95m, length variable from 2.8 to 3.75m.